Primary school de Verwondering
Future-proof primary school realised in record time
Designed and realised in a short space of time
De Verwondering primary school was designed and realised in a short space of time. What is special about the realisation of De Verwondering (Lent-Waalsprong) is the speed with which this project was carried out. The preparation of this project started in April 2013 and the start of execution in January 2014. The school was completed in June thanks to the excellent cooperation between Algeco and the other parties involved.
The building was constructed using modular construction. Our building systems are future-proof. The structure is such that it is easy to add or remove extra space. Changes in the layout can also be realised quickly, without unnecessary inconvenience.
The building is flexible in its application, but also flexible in its expansion. The school was built for four hundred students, but it is expected that there will be six hundred at some point.
- Project specificaties
-
LocatieLent
-
BrancheEducation
-
Bouwtijd5 months
-
Aantal units
-
Bedrijfstak
Dedicated to economical operations
Right from the start, investments were made in sustainability and economical operation. Therefore, low-maintenance window frames, less painting and durable floors were chosen. There was a conscious emphasis on a building with low maintenance costs.
Energy Performance Coefficient (EPC):
The EPC of De Verwondering is between 25 and 50% lower than the minimum required by regulations.
Ventilation:
Ventilation quantities are adjusted to Fresh Schools Class B and CO2 controlled per group room.
GPR score:
The average GPR score is: 8.3