• Expert in modular spaces
  • Over 60 years of experience
  • Fast and pragmatic
  • Always a suitable solution

Primary school de Verwondering

Future-proof primary school realised in record time

Designed and realised in a short space of time

De Verwondering primary school was designed and realised in a short space of time. What is special about the realisation of De Verwondering (Lent-Waalsprong) is the speed with which this project was carried out. The preparation of this project started in April 2013 and the start of execution in January 2014. The school was completed in June thanks to the excellent cooperation between Algeco and the other parties involved.

The building was constructed using modular construction. Our building systems are future-proof. The structure is such that it is easy to add or remove extra space. Changes in the layout can also be realised quickly, without unnecessary inconvenience.

The building is flexible in its application, but also flexible in its expansion. The school was built for four hundred students, but it is expected that there will be six hundred at some point.

 

share