Our realisations

Construction
Project description Soon online
Events
This building, comprising 11 Advance modules and 4 terraces, was installed in Spa.
Offices
The headquarters of Algeco Belgium have a beautiful showroom since a few weeks. These units showcase our units and their possible decoration!
Industry
Algeco supplied 150 units to Lyondell in various buildings: temporary office space, dressing room canteen and toilet facilities.
Construction
Project description Soon online
Offices
Permanent offices on three levels with a total area of approximately 1,250 sqm
Education
The temporary school building in Rotterdam offers a surface of 1134m².
Events
Project description Soon online
Offices
Construction of a building on 2 levels with an approximate area of 864 sqm.
Events
This radio studio, with a surface area of a mere 7m², was situated in a large wheel, 32m tall, beside the Wijnegem Shopping Centre.
Events
The GeoSea vessel Neptune was christened in Ostend.
Construction
Project description Soon online
Events
Project description Soon online
Events
Poject description Soon online
Construction
A temporary office with a surface area of 720m².
Industry
Bayer, in Maasvlakte - During the four week maintenance and renovation of a factory.
Education
A school building made of 24 modules with a total surface area of 432m² was set up in Braine-l'Alleud.
Construction
Permanent offices with a gross ground-surface area of 378m².
Construction
A permanent office with a surface are of 378m².
Industry
48 Office units, 864m² surface. A 2-storey building, 10-year lease contract.
Events
The Q Beach House is a new installation on the beach at Ostend.
Events
Advance unit for Studio Brussel
Offices
This temporary restaurant was erected beside the E19 expressway in Thieu.
Construction
This building has a surface area of more than 3,200m².
Events
Advance Module with a unique structure for Randstad at a festival in Werchter.
Construction
Infrastructures in the company house style for Verenigde Schilders Bedrijven Heko B.V.
Events
Coloured Origin Modules, created specially for the Zomer van Antwerpen event.
Events
Project description Soon online
Events
Advance Module type used for the Donna Radio station.
Construction
Project description Soon online
Industry
Project description Binnenkort online
Industry
Project description Heerema worked together with Algeco in a 24-hour shift system and set up 52 units, with a total surface of 936m², in a matter of 3 days. This included offices, change rooms, a coffee corner and sanitary installations on the ‘de Balder’ pontoon. Starting date: 4 weeks following...
Education
Construction of a school consists of 4 buildings with a total area of approximately 3,400 sqm
Industry
Project description Soon online
Offices
A permanent space for offices and laboratories.

GSK

Construction
Projectbeschrijving Soon online
Education
Project description Soon online

360° Services

The Algeco 360° Services have been specially developed to provide our customers with all-round ready-to-use solutions.

Consequently our customers will no longer be confronted with the organization and management of several suppliers or will no longer have to wait for several parties. In other words, no worries, no loss of time and extra costs.

Only 1 correspondent and everything ready-to-use upon delivery